Dashboard

Colorkineticsactive
Billing

Credit costs per engine

What each tool costs to run, in credits. Runs by designers you sponsor draw from your sponsored credit pool at these rates. 1 credit ≈ $1 (a 500-credit block is $499). Heavy tools scale with the real work — a full set bills per room processed.

$12,000/yr
Your annual plan
1,000 / yr
Sponsored credits included
100 designers
Activates ≈
Light
Cross'er (single cross)
Cross one competitor product to your line.
1 credit
Bench Tool
Drag-and-drop topology / bench builder.
1 credit
Tech Tool
Product Q&A + troubleshooting.
1 credit
Lookbook
Scene / finish inspiration match.
1 credit
Standard
System Spec
Describe a space → fixture schedule, controls, wiring narrative + BOM.
2 credits
ControlSpec
Spot-and-dot controls on the plan → single-line, typicals + BOM.
2 credits
RetroSpec
Retrofit kits + rebate math + payback.
2 credits
Vision Spec
Photo → spec + AI render (3 model passes + image).
5 credits
TakeoffSpec (single sheet)
One drawing sheet → fixture/BOM take-off.
2 credits
Heavy (scales with the work)
Cross'er (whole schedule, per type)
Cross a whole luminaire schedule — billed per type crossed.
1 credit / item
One-Shot Full-Set Take-Off
Full drawing set → BOM — billed per room processed.
1 credit / room
PlanSpec
Whole plan set → spec — billed per room processed.
1 credit / room
RCP Fixture Fill (per room)
Fill a bare RCP with fixtures to the target level — per room.
1 credit / room
Point-by-Point Calc (per room)
Per-room point-by-point workplane grid — per room.
1 credit / room
These rates are read live from the metering table — the same numbers the billing engine charges. A run in progress is never interrupted over balance; overage sponsored credits are purchased at volume rates.